For “What base preparation and compaction details should a paver contract specify?” put the rule in the written agreement before the affected work…
Schedule Your Free ConsultationA paver contract should specify the hidden pavement section as clearly as the visible paver
The agreement should define intended loading, excavation depth, subgrade treatment, aggregate type, compacted base thickness, lift sequence, compaction method, bedding course, edge restraint, drainage, slope, and how unsuitable soil is handled. Surface-area pricing without the base assembly leaves the most important durability work undefined.
Use a cross-section, not a phrase such as “standard base”
Show every layer from subgrade to paver and distinguish loose placement from final compacted thickness.
Define the unsuitable-soil process
Old trenches, wet soil, roots, disturbed areas, or soft subgrade can require additional work. State how the condition is documented and how added excavation or material is priced.
Specify controlled compaction
Base should be placed in lifts appropriate to the material and equipment. Access constraints matter because large compaction equipment may not fit every site.
Coordinate drainage and edge restraint
Base preparation should preserve the planned surface elevations and support stable edges rather than solve only the center of the pavement.
Photograph hidden stages before bedding covers them
DreamPrint’s hardscaping planning guide covers paver systems more broadly. For a property-specific paver scope, continue to the hardscaping service.